Substation Scout

West Hempfield substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
A49 West Hempfield 230kV 230 750 Gas Withdrawn
B40 West Hempfield 69kV 69 90 Gas Withdrawn
B41 West Hempfield 138kV 138 90 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.