Septa substation interconnection queue
2 active projects totaling 336.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Septa as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Jan 2023 to Aug 2031 (4 filings).
Transmission owner as filed: Dominion (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI1-017 | Septa 500 kV | 500 | 300 | Battery | Withdrawn | Dec 2026 |
| C01-1372 | Septa 500 kV | 500 | 200 | Battery | Withdrawn | Aug 2031 |
| AC1-161 | Cavalier | 500 | 168.2 | Solar | In Service | Jan 2023 |
| AC2-141 | Sycamore Cross Solar | 500 | 168.2 | Solar | Under Construction | Apr 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Septa (DOM, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-19 | AC2-141 | Status change | n/a | Engineering and Procurement → Under Construction |
| 2026-09-28 | C01-1372 | Terminal status | 200 | Active → Withdrawn |
Other PJM queue substations in Surry County, VA
- Surry: 10 active, 336.7 MW of 10 filed
- Hopewell-Surry: 4 active, 325.8 MW of 15 filed
- Colonial Trail - Surry: 1 active, 250 MW of 2 filed
- Surry-Hopewell: 1 active, 89 MW of 2 filed
- Poolesville: none active of 8 filed
- Wakefield: none active of 8 filed
Other PJM queue substations in Isle of Wight County, VA
- Ivor-Oak Ridge: 1 active, 32.3 MW of 2 filed
- Myrtle-Windsor: 2 active, 16 MW of 4 filed
- Smithfield: 1 active, 12 MW of 3 filed
- Poolesville: none active of 8 filed
- Crittenden: none active of 2 filed
- Poolesville-Winchester: none active of 2 filed
- Smithfield-Surry: none active of 2 filed