Septa substation interconnection queue

2 active projects totalling 336.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
336.4active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI1-017 Septa 500 kV 500 300 Battery Withdrawn
C01-1372 Septa 500 kV 500 200 Battery Withdrawn
AC1-161 Cavalier 500 168.2 Solar In Service
AC2-141 Sycamore Cross Solar 500 168.2 Solar Engineering and Procurement

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.