Septa substation interconnection queue
3 active projects totalling 536.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
536.4active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-017 | Septa 500 kV | 500 | 300 | Battery | Withdrawn |
| C01-1372 | Septa 500 kV | 500 | 200 | Battery | Active |
| AC1-161 | Cavalier | 500 | 168.2 | Solar | In Service |
| AC2-141 | Sycamore Cross Solar | 500 | 168.2 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.