Colonial Trail - Surry substation interconnection queue

1 active project totalling 250 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1589 Colonial Trail - Surry 230 kV 230 250 Battery Active
AH1-324 Colonial Trail - Surry 230 kV 230 48 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.