Substation Scout

Surry, VA interconnection queue

17 active projects totalling 1,036.5 MW in the PJM queue, plus 26 with terminal status (shown greyed).

17active projects
1,036.5active MW
43total filed
Queue IDProjectkVMWResourceStatus
AI1-017 Septa 500 kV 500 300 Battery Withdrawn
C01-1589 Colonial Trail - Surry 230 kV 230 250 Battery Active
AG1-011 Colonial Trail 230 kV 230 160 Battery Withdrawn
AE2-270 Hopewell-Surry 230 kV 230 150 Hybrid Withdrawn
C01-1500 Surry - Wards Creek 230 kV (AG1-000B/AF2-304 switching station) 230 120 Battery Active
AI2-039 Poolesville 230kV 230 100 Battery Withdrawn
AD1-025 Spring Grove Solar II 230 94.2 Solar In Service
AH1-717 Gravel Neck 230 kV 230 92.7 Gas Withdrawn
AD1-151 Wild Indigo Solar 230 90 Solar Pending Termination
AF2-304 Bear Island Solar 230 89 Hybrid Engineering and Procurement
AF2-065 Surry-Hopewell 230 kV 230 76.5 Solar Withdrawn
C01-1118 Surry 230 kV 230 75 Battery Active
S114 Surry Power Station - Units 1 & 2 230 75 Nuclear In Service
S115 Surry Power Station - Units 1 & 2 500 75 Nuclear In Service
AB2-134 Colonial Trail West Solar 230 71.8 Solar In Service
AC1-216 Spring Grove I Solar 230 54.8 Solar In Service
AH1-090 Surry - Hopewell 230 kV 230 48 Hybrid Withdrawn
AH1-324 Colonial Trail - Surry 230 kV 230 48 Solar Withdrawn
AE2-004 Poolesville 230 kV 230 40.3 Solar Withdrawn
AF1-115 Poolesville 230 kV 230 40.2 Solar Withdrawn
AG2-661 Hopewell - Colonial Trail 230 kV 230 20 Hybrid Active
S82 Gravel Neck Gas Turbine #3 230 19 Gas In Service
S83 Gravel Neck Gas Turbine #4 230 19 Gas In Service
S84 Gravel Neck Gas Turbine #5 230 19 Gas In Service
S85 Gravel Neck Gas Turbine #6 230 19 Gas In Service
AD2-008 Hopewell-Surry 230 kV 230 16.4 Solar Withdrawn
S111 Surry Power Station - Units 1 & 2 500 15 Nuclear In Service
S113 Surry Power Station - Units 1 & 2 230 15 Nuclear In Service
AE2-078 Mantura 34.5 13.2 Solar Withdrawn
AE2-079 Mantura II 34.5 13.2 Solar Withdrawn
AE2-080 Poolesville 34.5 kV 34.5 13.2 Solar Withdrawn
AF1-033 Surry Solar Center 34 13.2 Solar Withdrawn
AG2-667 Wakesfield - Poolesville 34.5 kV 34.5 12.5 Solar Withdrawn
AG1-171 Hopewell-Surry 230kV 230 12 Solar Withdrawn
AG1-172 Hopewell-Surry 230 kV 230 12 Solar Withdrawn
AG1-173 Hopewell-Surry 230 kV 230 12 Solar Withdrawn
AG1-174 Hopewell-Surry 230 kV 230 12 Solar Withdrawn
AG1-175 Hopewell-Surry 230 kV 230 12 Solar Withdrawn
C01-1162 Surry 230 kV 230 5.7 Nuclear Active
AD2-007 Hopewell-Surry 230 kV 230 4.5 Solar Withdrawn
AB1-155 Wakefield 34.5kV 34.5 3.8 Solar Withdrawn
AB1-159 Wakefield 34.5kV 34.5 3.8 Solar Withdrawn
AG1-009 Hopewell-Surry 230kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.