Surry-Hopewell substation interconnection queue
1 active project totalling 89 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
89active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-304 | Bear Island Solar | 230 | 89 | Hybrid | Engineering and Procurement |
| AF2-065 | Surry-Hopewell 230 kV | 230 | 76.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.