Surry-Hopewell substation interconnection queue
1 active project totaling 89 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Surry-Hopewell as the point of interconnection, all in Surry County, VA.
Target commercial operation dates as filed run from Oct 2021 to Sep 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
1active projects
89active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-304 | Bear Island Solar | 230 | 89 | Hybrid | Engineering and Procurement | Sep 2028 |
| AF2-065 | Surry-Hopewell 230 kV | 230 | 76.5 | Solar | Withdrawn | Oct 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Surry County, VA
- Surry: 10 active, 336.7 MW of 10 filed
- Septa: 2 active, 336.4 MW of 4 filed
- Hopewell-Surry: 4 active, 325.8 MW of 15 filed
- Colonial Trail - Surry: 1 active, 250 MW of 2 filed
- Poolesville: none active of 8 filed
- Wakefield: none active of 8 filed