Substation Scout

Lancaster, PA interconnection queue

8 active projects totalling 265.5 MW in the PJM queue, plus 33 with terminal status (shown greyed).

8active projects
265.5active MW
41total filed
Queue IDProjectkVMWResourceStatus
AA2-109 Rock Springs-Peach Bottom 500kV 500 1,100 Gas Withdrawn
U1-016 Muddy Run n/r 700 Gas Withdrawn
U2-074 Peach Bottom-Rock Springs 500kV 500 650 Gas Withdrawn
G14 TMI-Peach Bottom 500kV 500 610 Gas Withdrawn
B31 Brunner-West Hempfield 230kV 230 600 Gas Withdrawn
AA2-111 Cochranville-Peach Bottom 230kV 230 550 Gas Withdrawn
D19 Brunner-West Hempfield 230kV 230 550 Gas Withdrawn
D20 TMI-Peach Bottom 500kV 500 550 Gas Withdrawn
B35 West Earl 230 313 Gas Withdrawn
Q20 Holtwood n/r 140 Hydro In Service
AB1-111 Rock Springs-Peach Bottom 500kV 500 135 Gas Withdrawn
G36 Holtwood n/r 107 Hydro In Service
B39 Quarryville 69kV 69 90 Gas Withdrawn
B40 West Hempfield 69kV 69 90 Gas Withdrawn
B41 West Hempfield 138kV 138 90 Gas Withdrawn
B36 West Earl 230 78 Gas Withdrawn
AB1-110 Cochranville-Peach Bottom 230kV 230 70 Gas Withdrawn
I03 TMI-Peach Bottom 500kV 500 70 Gas Withdrawn
U2-085 Sakron-Prince #3 138kV 138 11.4 Gas Withdrawn
W1-054 Dart Container n/r 11.4 Gas In Service
U1-068 York 115 10 Gas Deactivated
AI2-075 Face Rock-Kinzer #13 69 kV 69 9.9 Solar Withdrawn
AE1-226 Holtwood Solar 69 9.4 Solar Withdrawn
AG1-245 Wakefield 12.47 kV 12.5 6.5 Solar Withdrawn
AH1-494 Wakefield 12 kV 12 6.4 Solar Withdrawn
W1-046 Face Rock 69kV 69 5.7 Solar Withdrawn
O01 Frey Farms LF 12 3.2 Gas Withdrawn
X2-026 Leola n/r 3.2 Gas Withdrawn
L08 Holtwood 69 2 Hydro In Service
V4-027 Keystone Solar n/r 1.9 Solar In Service
D01 Sight and Sound Theater 69 1.6 Gas In Service
U1-067 Granger of Honeybrook n/r 1.6 Gas In Service
W1-105 Heatherwoods Solar Farm n/r 1.1 Solar Withdrawn
AC2-170 Keystone Solar n/r 1.1 Solar Withdrawn
W2-059 Sight & Sound Theaters 12 1 Other Withdrawn
V4-075 Warwick 12kV 12 0.8 Solar Withdrawn
V3-051 Turkey Hill Dairy WF n/r 0.4 Wind Deactivated
AF2-279 LA-Blue Rock 12.5 0 Hybrid Withdrawn
AF2-280 LA-Buck 12.5 0 Hybrid Withdrawn
Q44 Elizabethtown n/r 0 Gas In Service
R47 Not reported n/r 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.