Hanging Rock substation interconnection queue
3 active projects totaling 51 MW in the PJM queue, plus 2 with terminal status (shown grayed).
5 PJM queue filings name Hanging Rock as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Jun 2008 to Jun 2027 (5 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X1-027 | Hanging Rock 138kV | 138 | 200 | Coal | Withdrawn | Jun 2014 |
| AH1-686 | Hanging Rock 765 kV | 765 | 21 | Gas | Active | Jun 2027 |
| T73 | Hanging Rock CC2 | 765 | 20 | Gas | In Service | Jun 2008 |
| AA1-013 | Cornu | 765 | 10 | Gas | In Service | Oct 2015 |
| Y3-096 | Hanging Rock 765kV | 765 | 0 | Battery | Withdrawn | Mar 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Hanging Rock (AEP, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Scioto County, OH
- North Haverhill: 1 active, 75 MW of 2 filed
- Wakefield: none active of 8 filed
Other PJM queue substations in Lawrence County, OH
No other substation in Lawrence County, OH is named as a point of interconnection in the PJM queue.