Poolesville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).
8 PJM queue filings name Poolesville as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Jun 2021 to Sep 2026 (8 filings).
0active projects
0active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-039 | Poolesville 230kV | 230 | 100 | Battery | Withdrawn | Sep 2026 |
| AE2-004 | Poolesville 230 kV | 230 | 40.3 | Solar | Withdrawn | Jun 2021 |
| AF1-115 | Poolesville 230 kV | 230 | 40.2 | Solar | Withdrawn | Dec 2021 |
| AE2-078 | Mantura | 34.5 | 13.2 | Solar | Withdrawn | Jun 2022 |
| AE2-079 | Mantura II | 34.5 | 13.2 | Solar | Withdrawn | Jun 2022 |
| AE2-080 | Poolesville 34.5 kV | 34.5 | 13.2 | Solar | Withdrawn | Jun 2021 |
| AF1-033 | Surry Solar Center | 34 | 13.2 | Solar | Withdrawn | Feb 2023 |
| AG1-081 | Poolesville 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Surry County, VA
- Surry: 10 active, 336.7 MW of 10 filed
- Septa: 2 active, 336.4 MW of 4 filed
- Hopewell-Surry: 4 active, 325.8 MW of 15 filed
- Colonial Trail - Surry: 1 active, 250 MW of 2 filed
- Surry-Hopewell: 1 active, 89 MW of 2 filed
- Wakefield: none active of 8 filed
Other PJM queue substations in Isle of Wight County, VA
- Septa: 2 active, 336.4 MW of 4 filed
- Ivor-Oak Ridge: 1 active, 32.3 MW of 2 filed
- Myrtle-Windsor: 2 active, 16 MW of 4 filed
- Smithfield: 1 active, 12 MW of 3 filed
- Crittenden: none active of 2 filed
- Poolesville-Winchester: none active of 2 filed
- Smithfield-Surry: none active of 2 filed
Site Scanner