Queue IDProjectkVMWResourceStatus
AI2-039 Poolesville 230kV 230 100 Battery Withdrawn
AE2-004 Poolesville 230 kV 230 40.3 Solar Withdrawn
AF1-115 Poolesville 230 kV 230 40.2 Solar Withdrawn
AE2-078 Mantura 34.5 13.2 Solar Withdrawn
AE2-079 Mantura II 34.5 13.2 Solar Withdrawn
AE2-080 Poolesville 34.5 kV 34.5 13.2 Solar Withdrawn
AF1-033 Surry Solar Center 34 13.2 Solar Withdrawn
AG1-081 Poolesville 34.5 kV 34.5 12 Solar Withdrawn