Poolesville substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).

8 PJM queue filings name Poolesville as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Jun 2021 to Sep 2026 (8 filings).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-039 Poolesville 230kV 230 100 Battery Withdrawn Sep 2026
AE2-004 Poolesville 230 kV 230 40.3 Solar Withdrawn Jun 2021
AF1-115 Poolesville 230 kV 230 40.2 Solar Withdrawn Dec 2021
AE2-078 Mantura 34.5 13.2 Solar Withdrawn Jun 2022
AE2-079 Mantura II 34.5 13.2 Solar Withdrawn Jun 2022
AE2-080 Poolesville 34.5 kV 34.5 13.2 Solar Withdrawn Jun 2021
AF1-033 Surry Solar Center 34 13.2 Solar Withdrawn Feb 2023
AG1-081 Poolesville 34.5 kV 34.5 12 Solar Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Surry County, VA

All 43 PJM queue filings in Surry County, VA.

Other PJM queue substations in Isle of Wight County, VA

All 25 PJM queue filings in Isle of Wight County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first