Larrabee Collector Station

Named in 1 PJM planning document for 1 project, on May 8, 2026.

Newdescribed as
JCPLzone
230 kVkV as printed
1mentions

Described as new: “Larrabee Collector Station-Larrabee 230 kV new line” — source, page 24

PJM interconnection queue

A PJM queue substation page has the same name: Larrabee Collector Station (NJ) — 2 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations
b3737.2
Not printed Not printed 6/1/2029 Not printed 2026-05-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 24
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations “Larrabee Collector Station-Larrabee 230 kV new line”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.