College Corner substation interconnection queue

2 active projects totaling 37.2 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jul 2019 to Apr 2028 (6 filings). 2 active filings target a date after November 27, 2026.

2active projects
37.2active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-211 College Corner 138 kV 138 60 Solar Withdrawn Dec 2023
AI2-238 College Corner 138 kV 138 39.4 Solar Withdrawn Jun 2025
AC2-111 Angelina Solar I 138 30.4 Solar Under Construction Apr 2027
AG1-049 College Corner 138 kV 138 17.6 Solar Withdrawn Dec 2021
AE1-008 College Corner 138 kV 138 7.6 Solar Withdrawn Jul 2019
AF1-071 Angelina Solar I 138 6.8 Solar Under Construction Apr 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-14AC2-111Status changen/a Engineering and Procurement → Under Construction

Other PJM queue substations in Henry County, IN

All 8 PJM queue filings in Henry County, IN.

Other PJM queue substations in Preble County, OH

All 15 PJM queue filings in Preble County, OH.