College Corner substation interconnection queue
2 active projects totaling 37.2 MW in the PJM queue, plus 4 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jul 2019 to Apr 2028 (6 filings). 2 active filings target a date after November 27, 2026.
2active projects
37.2active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-211 | College Corner 138 kV | 138 | 60 | Solar | Withdrawn | Dec 2023 |
| AI2-238 | College Corner 138 kV | 138 | 39.4 | Solar | Withdrawn | Jun 2025 |
| AC2-111 | Angelina Solar I | 138 | 30.4 | Solar | Under Construction | Apr 2027 |
| AG1-049 | College Corner 138 kV | 138 | 17.6 | Solar | Withdrawn | Dec 2021 |
| AE1-008 | College Corner 138 kV | 138 | 7.6 | Solar | Withdrawn | Jul 2019 |
| AF1-071 | Angelina Solar I | 138 | 6.8 | Solar | Under Construction | Apr 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-14 | AC2-111 | Status change | n/a | Engineering and Procurement → Under Construction |
Other PJM queue substations in Henry County, IN
- Madison-Tanners Creek: 1 active, 91.5 MW of 5 filed
- Desoto-Tanners Creek: 1 active, 26 MW of 5 filed
- Madison - Tanners Creek: 1 active, 10.6 MW of 2 filed
Other PJM queue substations in Preble County, OH
- Camden: 1 active, 0 MW of 8 filed
- West Manchester: none active of 2 filed
- West Manchester-Crown: none active of 2 filed