West Manchester substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name West Manchester as the point of interconnection, all in Preble County, OH.
Target commercial operation dates as filed run from Oct 2022 to Dec 2026 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-067 | West Manchester 69 kV | 69 | 24 | Solar | Withdrawn | Oct 2022 |
| AI2-398 | West Manchester 69 kV | 69 | 9.6 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Preble County, OH
- College Corner: 2 active, 37.2 MW of 6 filed
- Camden: 1 active, 0 MW of 8 filed
- West Manchester-Crown: none active of 2 filed