Beach Haven

Named in 1 PJM planning document for 1 project, on May 8, 2026.

Newdescribed as
PPLzone
230kVkV as printed
1mentions

Described as new: “Install nine bays of new BAAH 230kV switchyard with a 144 MVAR Capacitor bank” — source, page 12

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Beach Haven, PA
PPL-2026-0003
Conceptual $81.2 M 05/30/2028 1,500 MW 2026-05-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 5/2028 → 05/30/2028 2026-03-10 2026-05-08

Every mention

DateDocumentProjectWhat the document says about it
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 12
Beach Haven, PA “Install nine bays of new BAAH 230kV switchyard with a 144 MVAR Capacitor bank”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.