Vernon substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AF1-303 Vernon 115 kV 115 21.4 Battery Withdrawn
W4-067 Vernon 12kV 12 3 Solar Withdrawn
AF2-442 Vernon 115 kV 115 0 Not reported Withdrawn
AF2-443 Vernon 115 kV 115 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.