Vernon substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-303 | Vernon 115 kV | 115 | 21.4 | Battery | Withdrawn |
| W4-067 | Vernon 12kV | 12 | 3 | Solar | Withdrawn |
| AF2-442 | Vernon 115 kV | 115 | 0 | Not reported | Withdrawn |
| AF2-443 | Vernon 115 kV | 115 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.