Branchville-Holiday Lakes substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W3-126 Syncarpha Ty Solar Farm 34.5 6.4 Solar Withdrawn
X1-105 Branchville-Holiday Lakes 34.5kV 34.5 4.3 Solar Withdrawn
W2-084 Roberts Solar Farm 34.5 3.8 Solar Withdrawn
AF1-019 Viridity Energy Solutions Montague Storage 34.5 0 Battery In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.