Branchville-Holiday Lakes substation interconnection queue
1 active project totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W3-126 | Syncarpha Ty Solar Farm | 34.5 | 6.4 | Solar | Withdrawn |
| X1-105 | Branchville-Holiday Lakes 34.5kV | 34.5 | 4.3 | Solar | Withdrawn |
| W2-084 | Roberts Solar Farm | 34.5 | 3.8 | Solar | Withdrawn |
| AF1-019 | Viridity Energy Solutions Montague Storage | 34.5 | 0 | Battery | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.