Branchville-Holiday Lakes substation interconnection queue

1 active project totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name Branchville-Holiday Lakes as the point of interconnection, all in Sussex County, NJ.

Target commercial operation dates as filed run from Feb 2012 to Jan 2025 (4 filings).

1active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
W3-126 Syncarpha Ty Solar Farm 34.5 6.4 Solar Withdrawn Sep 2014
X1-105 Branchville-Holiday Lakes 34.5kV 34.5 4.3 Solar Withdrawn Feb 2012
W2-084 Roberts Solar Farm 34.5 3.8 Solar Withdrawn Jun 2014
AF1-019 Viridity Energy Solutions Montague Storage 34.5 0 Battery In Service Jan 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, NJ

All 68 PJM queue filings in Sussex County, NJ.