12 active projects totalling 14 MW in the PJM queue, plus 56 with terminal status (shown greyed).

12active projects
14active MW
68total filed
Queue IDProjectkVMWResourceStatus
U2-064 Branchburg-Ramapo 500kV 500 1,000 Hydro Withdrawn
AE2-237 Vernon-Sugar Loaf #2 115 kV 115 21.4 Battery Withdrawn
W4-101 Limecrest-Newton 34.5kV 34.5 7.6 Solar Withdrawn
W3-126 Syncarpha Ty Solar Farm 34.5 6.4 Solar Withdrawn
W3-145 Hampton Township Solar Farm 34.5 6.4 Solar Withdrawn
X1-106 Sussex n/r 6.4 Solar Withdrawn
X3-033 Green n/r 6.1 Solar Withdrawn
AI2-205 Branchville - Sussex 34.5 kV 34.5 5.9 Solar Withdrawn
AC1-020 Kittatinny-Newton 34.5 kV 34.5 4.6 Solar Withdrawn
X1-105 Branchville-Holiday Lakes 34.5kV 34.5 4.3 Solar Withdrawn
X3-072 Lafayette n/r 4 Solar Withdrawn
W2-084 Roberts Solar Farm 34.5 3.8 Solar Withdrawn
W3-136 Hibler Solar Farm 34.5 3.8 Solar Withdrawn
X1-012 Frankford Solar Farm 34.5 3.8 Solar In Service
X2-097 Andover n/r 3.8 Solar Withdrawn
X2-099 Sparta Solar Farm 34 3.8 Solar Withdrawn
X3-083 Andover Solar Farm 34 3.8 Solar Withdrawn
Y1-020 Beaver Run Solar Farm 34 3.7 Solar In Service
V3-011 Sussex County Land Fill 12.5 3.4 Gas Deactivated
AG2-177 Limecrest-Woodruff's Gap 34.5 kV 34.5 3.4 Solar Withdrawn
W4-067 Vernon 12kV 12 3 Solar Withdrawn
X1-046 Morris Solar Farm 34 3 Solar Withdrawn
X3-085 Sussex 34kV 34 3 Solar Withdrawn
C01-2248 Sussex 12.47 kV 12.5 2.9 Solar Withdrawn
W3-110 Wantage Solar Farm n/r 2.9 Solar In Service
X1-116 Frankford Solar Farm 34 2.7 Solar Withdrawn
AI1-122 Sparta LF Solar 34.5 kV 34.5 2.5 Solar Withdrawn
X4-012 Plains Road Solar Farm 34 2.3 Solar Withdrawn
C01-1039 Woodruffs Gap, Bank 2 12.47 kV 12.5 2 Solar Active
W1-122 Lower Unionville Road Solar Farm 12.5 1.9 Solar Withdrawn
W4-066 Sussex n/r 1.9 Solar Withdrawn
X3-054 Hough Solar Farm n/r 1.9 Solar Withdrawn
Y1-038 Sparta n/r 1.9 Solar Withdrawn
AG2-458 Kittatinny-Newton 34.5 kV II 34.5 1.9 Battery Withdrawn
AC2-134 Hamburg 34.5kV 34.5 1.8 Solar Withdrawn
X1-075 Sussex 12kV 12 1.5 Solar Withdrawn
X1-081 Andover 12kV 12 1.5 Solar Withdrawn
X1-100 Mattison Road Solar Farm 12 1.5 Solar Withdrawn
X1-103 Branchville-Sussex 34.5kV 34.5 1.5 Solar Withdrawn
X1-118 Hampton #2 n/r 1.5 Solar Withdrawn
X1-119 Andover #2 n/r 1.5 Solar Withdrawn
X3-084 Wantage n/r 1.5 Solar Withdrawn
X3-086 Lafayette n/r 1.5 Solar Withdrawn
X2-096 Wantage n/r 1.5 Solar Withdrawn
AE2-105 Kittatinny-Newton Solar 34.5 kV 34.5 1.5 Solar Withdrawn
V4-017 Woodruffs Gap 345kV 345 1.3 Solar Withdrawn
X1-117 Hampton n/r 1.1 Solar Withdrawn
W4-064 Augusta Solar Farm 12 1.1 Solar In Service
W4-065 Layton Road Solar Farm 12 1.1 Solar Withdrawn
X1-107 Hopatcong n/r 1.1 Solar Withdrawn
X1-114 Sandyston Solar Farm 12 0.8 Solar Withdrawn
Y1-084 Fredon Solar Farm 34.5 0.8 Solar Withdrawn
AE1-081 Durban Ave Solar 12.5 0.5 Solar In Service
X1-115 Andover n/r 0.4 Solar Withdrawn
AA2-060 Roy Road Battery Storage Facility 34 0 Battery In Service
AA2-061 Roy Road Battery Storage Facility 34.5 0 Battery In Service
AA2-062 Branchville-N. Newton #1 34.kV n/r 0 Battery Withdrawn
AA2-063 Branchville-N. Newton #2 34.5kV 34.5 0 Battery Withdrawn
AA2-064 Branchville-N. Newton #3 34.5kV 34.5 0 Battery Withdrawn
AA2-117 Sussex n/r 0 Battery Withdrawn
AE1-060 VESI – Andover Energy Storage 34.5 0 Battery In Service
AE1-203 Iliff 12.47 kV 12.5 0 Battery Withdrawn
AF1-019 Viridity Energy Solutions Montague Storage 34.5 0 Battery In Service
AF1-325 Houses Corner Storage 34.5 0 Battery Engineering and Procurement
AF2-442 Vernon 115 kV 115 0 Not reported Withdrawn
AF2-443 Vernon 115 kV 115 0 Not reported Withdrawn
W3-106 Beaver Run Solar Farm 34.5 0 Solar In Service
Z2-095 Branchville-Sussex 34kV 34 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.