0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Andover as the point of interconnection, all in Sussex County, NJ.
Target commercial operation dates as filed run from Dec 2012 to Jul 2013 (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X2-097 | Andover | n/r | 3.8 | Solar | Withdrawn | Jul 2013 |
| X1-081 | Andover 12kV | 12 | 1.5 | Solar | Withdrawn | Dec 2012 |
| X1-115 | Andover | n/r | 0.4 | Solar | Withdrawn | Mar 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Andover (JCPL, 1 mention).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Sussex County, NJ
- Sussex: 2 active, 6.6 MW of 11 filed
- Branchville-Sussex: 1 active, 3.8 MW of 4 filed
- Branchville-Holiday Lakes: 1 active, 0 MW of 4 filed
- Vernon: none active of 4 filed
- Andover-Kittatinny: none active of 3 filed
- Wantage: none active of 3 filed
- Kittatinny-Newton: 1 active, 0 MW of 2 filed
- Lafayette: none active of 2 filed
- Sparta-Woodruff's Gap: 1 active, 0 MW of 2 filed