Andover substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
X2-097 Andover n/r 3.8 Solar Withdrawn
X1-081 Andover 12kV 12 1.5 Solar Withdrawn
X1-115 Andover n/r 0.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.