Wantage substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
W1-122 Lower Unionville Road Solar Farm 12.5 1.9 Solar Withdrawn
X3-084 Wantage n/r 1.5 Solar Withdrawn
X2-096 Wantage n/r 1.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.