Sparta-Woodruff's Gap substation interconnection queue
1 active project totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Sparta-Woodruff's Gap as the point of interconnection, all in Sussex County, NJ.
Target commercial operation dates as filed run from Dec 2014 to Dec 2026 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X2-099 | Sparta Solar Farm | 34 | 3.8 | Solar | Withdrawn | Dec 2014 |
| AF1-325 | Houses Corner Storage | 34.5 | 0 | Battery | Engineering and Procurement | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Sussex County, NJ
- Sussex: 2 active, 6.6 MW of 11 filed
- Branchville-Sussex: 1 active, 3.8 MW of 4 filed
- Branchville-Holiday Lakes: 1 active, 0 MW of 4 filed
- Vernon: none active of 4 filed
- Andover: none active of 3 filed
- Andover-Kittatinny: none active of 3 filed
- Wantage: none active of 3 filed
- Kittatinny-Newton: 1 active, 0 MW of 2 filed
- Lafayette: none active of 2 filed