Haumesser Road substation interconnection queue

1 active project totalling 2.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
2.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-107 Haumesser Road 138 kV 138 54 Solar Withdrawn
AB2-132 Lee-DeKalb Wind Energy Center n/r 2.2 Hybrid In Service
Y2-048 Haumesser Road n/r 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.