Crego Rd substation interconnection queue
2 active projects totaling 114 MW in the PJM queue.
2 PJM queue filings name Crego Rd as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Feb 2028 to May 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (1 filing).
2active projects
114active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-127 | Red Maple Solar | 138 | 57.1 | Solar | EP | May 2028 |
| AF2-366 | Red Maple Solar | 138 | 56.9 | Solar | Engineering and Procurement | Feb 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in DeKalb County, IL
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Davis Creek: 7 active, 725.4 MW of 15 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Sugar Grove-Waterman: 1 active, 180 MW of 2 filed
- Haumesser Road: 1 active, 2.2 MW of 3 filed
- Sandwich: none active of 5 filed
- Byron-Wayne: none active of 2 filed
- Glidden-Waterman (CIR Increase): none active of 2 filed
- Steward: none active of 2 filed
- Waterman: none active of 2 filed
- Wayne-Byron: none active of 2 filed
- West Dekalb: none active of 2 filed
Other PJM queue substations in Adams County, IL
- Chicago Heights: 1 active, 250 MW of 5 filed
- Nelson-Dixon: none active of 3 filed