Substation Scout

Crego Rd substation interconnection queue

2 active projects totalling 114 MW in the PJM queue.

2active projects
114active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-127 Red Maple Solar 138 57.1 Solar EP
AF2-366 Red Maple Solar 138 56.9 Solar Engineering and Procurement

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.