Substation Scout

Crego Rd substation interconnection queue

2 active projects totaling 114 MW in the PJM queue.

2 PJM queue filings name Crego Rd as the point of interconnection, all in IL.

Target commercial operation dates as filed run from Feb 2028 to May 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: ComEd (1 filing).

2active projects
114active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-127 Red Maple Solar 138 57.1 Solar EP May 2028
AF2-366 Red Maple Solar 138 56.9 Solar Engineering and Procurement Feb 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in DeKalb County, IL

All 40 PJM queue filings in DeKalb County, IL.

Other PJM queue substations in Adams County, IL

All 8 PJM queue filings in Adams County, IL.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first