West Dekalb substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-220 | West Dekalb 138 kV | 138 | 90 | Solar | Withdrawn |
| AE1-233 | West Dekalb 138 kV | 138 | 24.3 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.