Normandy substation interconnection queue

3 active projects totaling 127.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).

5 PJM queue filings name Normandy as the point of interconnection, all in IL.

Target commercial operation dates as filed run from May 2013 to Dec 2027 (5 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ComEd (1 filing).

3active projects
127.4active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
O29 Green River Wind Farm Phase 2 138 45 Wind In Service Oct 2019
O09 Walnut Ridge Wind, LLC n/r 42.4 Wind In Service Oct 2018
C01-1622 Normandy 138 kV 138 40 Wind Active Dec 2027
P37 Normandy 138kV 138 28 Wind Withdrawn May 2013
AD2-041 Normandy n/r 11.6 Solar Withdrawn Dec 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Lee County, IL

All 106 PJM queue filings in Lee County, IL, including 1 more substations.

Other PJM queue substations in Whiteside County, IL

All 13 PJM queue filings in Whiteside County, IL.

Other PJM queue substations in Bureau County, IL

All 23 PJM queue filings in Bureau County, IL.