Normandy substation interconnection queue

3 active projects totalling 127.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
127.4active MW
5total filed
Queue IDProjectkVMWResourceStatus
O29 Green River Wind Farm Phase 2 138 45 Wind In Service
O09 Walnut Ridge Wind, LLC n/r 42.4 Wind In Service
C01-1622 Normandy 138 kV 138 40 Wind Active
P37 Normandy 138kV 138 28 Wind Withdrawn
AD2-041 Normandy n/r 11.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.