Glidden-Waterman (CIR Increase) substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-405 Glidden-Waterman 138 kV (CIR Increase) 138 22.8 Solar Withdrawn
AI2-403 Glidden-Waterman 138 kV (CIR Increase) 138 19.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.