Glidden-Waterman (CIR Increase) substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-405 | Glidden-Waterman 138 kV (CIR Increase) | 138 | 22.8 | Solar | Withdrawn |
| AI2-403 | Glidden-Waterman 138 kV (CIR Increase) | 138 | 19.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.