Nelson (CIR Increase) substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-384 Nelson 138kV (CIR Increase) 138 89.4 Wind Withdrawn
AI2-263 Nelson 345kV (CIR Increase) 345 24 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.