Nelson-Lee County substation interconnection queue
1 active project
totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1 active projects
0 active MW
4 total filed
Queue ID Project kV MW Resource Status
AH2-122
Nelson-Lee County 345 kV
345
100
Battery
Withdrawn
AF2-183
Nelson-Lee County 345 kV
345
32
Battery
Withdrawn
AF1-281
Nelson-Lee County
n/r
3
Battery
Withdrawn
AF1-280
South Dixon Solar
n/r
0
Solar
EP
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.