Nelson-Lee County substation interconnection queue
1 active project totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-122 | Nelson-Lee County 345 kV | 345 | 100 | Battery | Withdrawn |
| AF2-183 | Nelson-Lee County 345 kV | 345 | 32 | Battery | Withdrawn |
| AF1-281 | Nelson-Lee County | n/r | 3 | Battery | Withdrawn |
| AF1-280 | South Dixon Solar | n/r | 0 | Solar | EP |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.