Sugar Grove-Waterman substation interconnection queue
1 active project totalling 180 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
180active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-118 | Burr Oak Solar | 138 | 180 | Solar | EP |
| AI2-408 | Sugar Grove-Waterman 138kV | 138 | 72 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.