Lee County substation interconnection queue
1 active project totalling 48 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
48active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC1-185 | Lee Energy Facility | n/r | 48 | Gas | In Service |
| T106 | Lee County | n/r | 28 | Wind | Withdrawn |
| V3-014 | Lee County | n/r | 20.8 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.