Dixon-Mendota substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| P17 | Dixon-Mendota 34kV | 34 | 4 | Wind | Withdrawn |
| M18 | Dixon-Mendota 34kV | 34 | 1.7 | Wind | Withdrawn |
| P18 | Dixon-Mendota 34.5kV | 34.5 | 0.5 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.