Electric Junction-Nelson substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-346 | Electric Junction-Nelson 345 kV | 345 | 45 | Solar | Withdrawn |
| AG1-434 | Electric Junction-Nelson 345 kV | 345 | 35.2 | Wind | Withdrawn |
| AF1-317 | Electric Junction-Nelson 354 kV | 354 | 20 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.