Mendota Hills substation interconnection queue
3 active projects totalling 14.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
14.7active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-429 | Mendota Hills 138 kV | 138 | 22.2 | Wind | Withdrawn |
| AB2-191 | Mendota Hills Wind Farm | n/r | 8.4 | Wind | In Service |
| Z1-073 | Mendota Hills | n/r | 5.2 | Wind | In Service |
| AD1-067 | Mendota Hills Wind Farm | n/r | 1.1 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.