Mendota Hills substation interconnection queue

3 active projects totalling 14.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).

3active projects
14.7active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI2-429 Mendota Hills 138 kV 138 22.2 Wind Withdrawn
AB2-191 Mendota Hills Wind Farm n/r 8.4 Wind In Service
Z1-073 Mendota Hills n/r 5.2 Wind In Service
AD1-067 Mendota Hills Wind Farm n/r 1.1 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.