Substation Scout

Schauff Road substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI2-248 Schauff Road 138 kV 138 40 Wind Withdrawn
AF1-010 Schauff Road n/r 30 Solar Withdrawn
AF1-011 Schauff Road n/r 30 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.