Schauff Road substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-248 | Schauff Road 138 kV | 138 | 40 | Wind | Withdrawn |
| AF1-010 | Schauff Road | n/r | 30 | Solar | Withdrawn |
| AF1-011 | Schauff Road | n/r | 30 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.