Cordova substation interconnection queue

4 active projects totaling 265 MW in the PJM queue, plus 2 with terminal status (shown grayed).

6 PJM queue filings name Cordova as the point of interconnection, all in IL.

Target commercial operation dates as filed run from Dec 2024 to Apr 2031 (6 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: ComEd (5 filings).

4active projects
265active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-462 Gipper Solar Farm 345 153 Solar EP Sep 2029
C01-1586 Cordova 345 kV 345 80 Battery Active Apr 2031
AH1-659 Cordova 345 kV 345 60 Solar Withdrawn Dec 2024
C01-1584 Cordova 345 kV 345 48 Battery Withdrawn Dec 2029
AG2-675 Cordova 345 kV 345 32 Battery Active Dec 2029
AG1-553 Beacon Solar 345 0 Solar EP Jan 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05C01-1584Terminal status48 Active → Withdrawn

Other PJM queue substations in Whiteside County, IL

All 13 PJM queue filings in Whiteside County, IL.

Other PJM queue substations in Rock Island County, IL

All 8 PJM queue filings in Rock Island County, IL.

Other PJM queue substations in Lee County, IL

All 106 PJM queue filings in Lee County, IL, including 1 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first