Cordova substation interconnection queue
5 active projects totalling 313 MW in the PJM queue, plus 1 with terminal status (shown greyed).
5active projects
313active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-462 | Gipper Solar Farm | 345 | 153 | Solar | EP |
| C01-1586 | Cordova 345 kV | 345 | 80 | Battery | Active |
| AH1-659 | Cordova 345 kV | 345 | 60 | Solar | Withdrawn |
| C01-1584 | Cordova 345 kV | 345 | 48 | Battery | Active |
| AG2-675 | Cordova 345 kV | 345 | 32 | Battery | Active |
| AG1-553 | Beacon Solar | 345 | 0 | Solar | EP |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.