Cordova substation interconnection queue
4 active projects totalling 265 MW in the PJM queue, plus 2 with terminal status (shown greyed).
4active projects
265active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-462 | Gipper Solar Farm | 345 | 153 | Solar | EP |
| C01-1586 | Cordova 345 kV | 345 | 80 | Battery | Active |
| AH1-659 | Cordova 345 kV | 345 | 60 | Solar | Withdrawn |
| C01-1584 | Cordova 345 kV | 345 | 48 | Battery | Withdrawn |
| AG2-675 | Cordova 345 kV | 345 | 32 | Battery | Active |
| AG1-553 | Beacon Solar | 345 | 0 | Solar | EP |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.