Nelson-Dixon substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Nelson-Dixon as the point of interconnection, all in IL.

Target commercial operation date as filed: Sep 2024 (3 filings).

Transmission owner as filed: ComEd (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-393 Nelson-Dixon 138 kV 138 55 Battery Withdrawn Sep 2024
AF2-394 Nelson-Dixon 138 kV 138 40 Battery Withdrawn Sep 2024
AF2-392 Bison Meadows Wind Project 138 35.2 Wind Withdrawn Sep 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Adams County, IL

All 8 PJM queue filings in Adams County, IL.

Other PJM queue substations in Lee County, IL

All 106 PJM queue filings in Lee County, IL, including 1 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first