Nelson-Electric Junction substation interconnection queue
6 active projects totaling 620 MW in the PJM queue, plus 10 with terminal status (shown grayed).
16 PJM queue filings name Nelson-Electric Junction as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Dec 2017 to Mar 2031 (16 filings). 6 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (8 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-041 | Steward Creek Solar | 345 | 180 | Solar | EP | Mar 2031 |
| AF2-200 | Steward Creek Solar | 345 | 120 | Solar | EP | Mar 2031 |
| AH1-150 | Nelson-Electric Junction 345 kV | 345 | 120 | Solar | Active | Oct 2029 |
| AH1-151 | Nelson-Electric Junction 345 kV | 345 | 120 | Solar | Active | Oct 2029 |
| AF2-199 | Steward Creek Solar | 345 | 60 | Solar | EP | Mar 2031 |
| AH2-089 | Nelson-Electric Junction 345 kV | 345 | 50 | Battery | Withdrawn | Dec 2027 |
| AH2-090 | Nelson-Electric Junction 345kV | 345 | 50 | Battery | Withdrawn | Dec 2024 |
| AH2-091 | Nelson-Electric Junction 345kV | 345 | 50 | Battery | Withdrawn | Dec 2026 |
| AI2-012 | Nelson-Electric Junction 345 kV | 345 | 45 | Battery | Withdrawn | Dec 2027 |
| P20 | Walnut Ridge Wind Farm | 345 | 42 | Wind | Withdrawn | Dec 2017 |
| AG1-371 | Nelson-Electric Junction 345 kV | 345 | 30 | Battery | Withdrawn | Nov 2024 |
| AI2-015 | Nelson-Electric Junction 345 kV | 345 | 30 | Battery | Withdrawn | Nov 2025 |
| AG1-372 | Nelson-Electric Junction 345 kV | 345 | 20 | Battery | Withdrawn | Nov 2024 |
| AG2-660 | Nelson-Electric Junction 345 kV | 345 | 20 | Battery | Active | Oct 2029 |
| AI2-011 | Nelson-Electric Junction 345 kV | 345 | 15 | Battery | Withdrawn | Dec 2027 |
| AG1-373 | Nelson-Electric Junction 345 kV | 345 | 10 | Battery | Withdrawn | Nov 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Nelson-Electric Junction” in IL. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Nelson - Electric Junction: PJM interconnection queue (IL)
Other PJM queue substations in Lee County, IL
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Nelson - Lee County: 2 active, 500 MW of 4 filed
- Cordova: 4 active, 265 MW of 6 filed
- Normandy: 3 active, 127.4 MW of 5 filed
- Nelson - Electric Junction: 1 active, 120 MW of 3 filed
- Shady Oaks Road: 1 active, 99.5 MW of 2 filed
- Lee County: 1 active, 48 MW of 3 filed
- McGirr-Mendota: 3 active, 21.9 MW of 3 filed
- Shady Oaks: 1 active, 21.2 MW of 2 filed
- Mendota Hills: 3 active, 14.7 MW of 4 filed
- Haumesser Road: 1 active, 2.2 MW of 3 filed
- Mendota: none active of 4 filed
- Nelson-Lee County: 1 active, 0 MW of 4 filed
- Dixon-Mendota: none active of 3 filed
- Electric Junction-Nelson: none active of 3 filed
- Nelson-Dixon: none active of 3 filed
- Schauff Road: none active of 3 filed
- Dixon: none active of 2 filed
- Dixon-McGirr: none active of 2 filed
- Nelson (CIR Increase): none active of 2 filed
All 106 PJM queue filings in Lee County, IL, including 1 more substations.
Other PJM queue substations in Bureau County, IL
- Normandy: 3 active, 127.4 MW of 5 filed
- Lee County: 1 active, 48 MW of 3 filed
- Crescent Ridge: 2 active, 28.7 MW of 6 filed
- Mendota: none active of 4 filed
- Crescent Ridge (CIR Increase): none active of 2 filed
- Kewanee-Streator: none active of 2 filed