Nelson-Electric Junction substation interconnection queue

6 active projects totalling 620 MW in the PJM queue, plus 10 with terminal status (shown greyed).

6active projects
620active MW
16total filed
Queue IDProjectkVMWResourceStatus
AF2-041 Steward Creek Solar 345 180 Solar EP
AF2-200 Steward Creek Solar 345 120 Solar EP
AH1-150 Nelson-Electric Junction 345 kV 345 120 Solar Active
AH1-151 Nelson-Electric Junction 345 kV 345 120 Solar Active
AF2-199 Steward Creek Solar 345 60 Solar EP
AH2-089 Nelson-Electric Junction 345 kV 345 50 Battery Withdrawn
AH2-090 Nelson-Electric Junction 345kV 345 50 Battery Withdrawn
AH2-091 Nelson-Electric Junction 345kV 345 50 Battery Withdrawn
AI2-012 Nelson-Electric Junction 345 kV 345 45 Battery Withdrawn
P20 Walnut Ridge Wind Farm 345 42 Wind Withdrawn
AG1-371 Nelson-Electric Junction 345 kV 345 30 Battery Withdrawn
AI2-015 Nelson-Electric Junction 345 kV 345 30 Battery Withdrawn
AG1-372 Nelson-Electric Junction 345 kV 345 20 Battery Withdrawn
AG2-660 Nelson-Electric Junction 345 kV 345 20 Battery Active
AI2-011 Nelson-Electric Junction 345 kV 345 15 Battery Withdrawn
AG1-373 Nelson-Electric Junction 345 kV 345 10 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.