Byron - Wayne substation interconnection queue

1 active project totaling 198.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Byron - Wayne as the point of interconnection, all in IL.

Target commercial operation dates as filed run from Dec 2025 to May 2031 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ComEd (1 filing).

1active projects
198.6active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1967 Byron - Wayne 345 kV 345 198.6 Wind Active May 2031
AH2-087 Byron - Wayne 345 kV 345 50 Battery Withdrawn Dec 2025
AH2-088 Byron - Wayne 345 kV 345 50 Battery Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Byron - Wayne” in IL. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in DeKalb County, IL

All 40 PJM queue filings in DeKalb County, IL.

Other PJM queue substations in Ogle County, IL

All 40 PJM queue filings in Ogle County, IL.