Queue IDProjectkVMWResourceStatus
AG1-119 Wayne-Byron 345 kV 345 180 Solar Withdrawn
AI2-409 Wayne-Byron 345 kV 345 72 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.