Wayne-Byron substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Wayne-Byron as the point of interconnection, all in DeKalb County, IL.
Target commercial operation dates as filed run from Dec 2023 to Dec 2026 (2 filings).
Transmission owner as filed: ComEd (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-119 | Wayne-Byron 345 kV | 345 | 180 | Solar | Withdrawn | Dec 2023 |
| AI2-409 | Wayne-Byron 345 kV | 345 | 72 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in DeKalb County, IL
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Davis Creek: 7 active, 725.4 MW of 15 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Sugar Grove-Waterman: 1 active, 180 MW of 2 filed
- Crego Rd: 2 active, 114 MW of 2 filed
- Haumesser Road: 1 active, 2.2 MW of 3 filed
- Sandwich: none active of 5 filed
- Byron-Wayne: none active of 2 filed
- Glidden-Waterman (CIR Increase): none active of 2 filed
- Steward: none active of 2 filed
- Waterman: none active of 2 filed
- West Dekalb: none active of 2 filed