Nelson - Lee County substation interconnection queue
2 active projects totalling 500 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
500active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1854 | Nelson - Lee County 345 kV | 345 | 300 | Battery | Active |
| C01-1855 | Nelson - Lee County 345 kV | 345 | 200 | Battery | Active |
| AH2-123 | Nelson - Lee County 345 kV | 345 | 100 | Battery | Withdrawn |
| AH2-124 | Nelson - Lee County 345 kV | 345 | 100 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.