Substation Scout

Shady Oaks Road substation interconnection queue

1 active project totalling 99.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
99.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-232 Shady Oaks Road 138 kV 138 99.5 Wind Withdrawn
C01-1276 Shady Oaks Road 138 kV 138 99.5 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.