Sandwich substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).
5 PJM queue filings name Sandwich as the point of interconnection, all in DeKalb County, IL.
Target commercial operation dates as filed run from Mar 2019 to Dec 2030 (5 filings).
Transmission owner as filed: ComEd (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1402 | Sandwich 138kV 138 kV | 138 | 153.9 | Solar | Withdrawn | Dec 2030 |
| AI1-147 | Sandwich 34kV | 34 | 38.4 | Solar | Withdrawn | Dec 2026 |
| AH2-290 | Sandwich 138 kV | 138 | 34.4 | Battery | Withdrawn | Dec 2025 |
| AH1-285 | Sandwich 138 kV | 138 | 11.2 | Solar | Withdrawn | Dec 2029 |
| AC2-156 | Sandwich 34.5kV | 34.5 | 7.6 | Solar | Withdrawn | Mar 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Sandwich (COMED, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in DeKalb County, IL
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Davis Creek: 7 active, 725.4 MW of 15 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Sugar Grove-Waterman: 1 active, 180 MW of 2 filed
- Crego Rd: 2 active, 114 MW of 2 filed
- Haumesser Road: 1 active, 2.2 MW of 3 filed
- Byron-Wayne: none active of 2 filed
- Glidden-Waterman (CIR Increase): none active of 2 filed
- Steward: none active of 2 filed
- Waterman: none active of 2 filed
- Wayne-Byron: none active of 2 filed
- West Dekalb: none active of 2 filed