Sandwich substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1402 | Sandwich 138kV 138 kV | 138 | 153.9 | Solar | Withdrawn |
| AI1-147 | Sandwich 34kV | 34 | 38.4 | Solar | Withdrawn |
| AH2-290 | Sandwich 138 kV | 138 | 34.4 | Battery | Withdrawn |
| AH1-285 | Sandwich 138 kV | 138 | 11.2 | Solar | Withdrawn |
| AC2-156 | Sandwich 34.5kV | 34.5 | 7.6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.