Sandwich substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1402 Sandwich 138kV 138 kV 138 153.9 Solar Withdrawn
AI1-147 Sandwich 34kV 34 38.4 Solar Withdrawn
AH2-290 Sandwich 138 kV 138 34.4 Battery Withdrawn
AH1-285 Sandwich 138 kV 138 11.2 Solar Withdrawn
AC2-156 Sandwich 34.5kV 34.5 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.