Hatfield substation interconnection queue

5 active projects totaling 2,295.8 MW in the PJM queue, plus 4 with terminal status (shown grayed).

9 PJM queue filings name Hatfield as the point of interconnection, all in Greene County, PA.

Target commercial operation dates as filed run from Dec 2006 to May 2032 (9 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: APS (2 filings).

5active projects
2,295.8active MW
9total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA1-070 Hatfield Ferry, Units 1, 2, and 3 500 1,590 Coal Withdrawn Jun 2019
AC2-025 Hatfield 500kV 500 1,140 Gas Withdrawn Jun 2022
AC1-097 Renaissance Energy Center 500 1,040 Gas Withdrawn Jun 2021
C01-1960 Hatfield 500 kV 500 931.1 Gas Active May 2031
C01-1723 Hatfield 500 kV 500 700 Gas Active May 2032
L10 Hatfield 500 kV 500 520 Coal Withdrawn Dec 2006
AA2-173 Hilltop Energy Center Facility 500 515 Gas In Service May 2021
AC2-142 Hilltop Energy Center Facility 500 129.7 Gas In Service May 2021
AB1-112 Hilltop Energy Center Facility 500 20 Gas In Service May 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Hatfield Substation (APS, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Greene County, PA

All 29 PJM queue filings in Greene County, PA.