Substation Scout

Watkins Corner substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA2-154 Watkins Corner 34.5kV 34.5 14 Solar Withdrawn
AG2-410 Watkins Corner 34.5 kV 34.5 12 Solar Withdrawn
AG2-217 Watkins Corner 34.5 kV 34.5 8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.