Watkins Corner substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-154 | Watkins Corner 34.5kV | 34.5 | 14 | Solar | Withdrawn |
| AG2-410 | Watkins Corner 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AG2-217 | Watkins Corner 34.5 kV | 34.5 | 8 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.