Substation Scout

Southampton- Handsom substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AH2-225 Southampton- Handsom 115kV 115 125 Battery Withdrawn
AH1-651 Southampton- Handsom 115kV 115 60 Solar Withdrawn
AH1-652 Southampton- Handsom 115kV 115 60 Solar Withdrawn
AI2-261 Southampton- Handsom 115kV 115 25 Solar Withdrawn
AI2-267 Southampton- Handsom 115kV 115 25 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.