Greene, PA interconnection queue

5 active projects totalling 2,295.8 MW in the PJM queue, plus 24 with terminal status (shown greyed).

5active projects
2,295.8active MW
29total filed
Queue IDProjectkVMWResourceStatus
AA1-070 Hatfield Ferry, Units 1, 2, and 3 500 1,590 Coal Withdrawn
AC2-025 Hatfield 500kV 500 1,140 Gas Withdrawn
AC1-097 Renaissance Energy Center 500 1,040 Gas Withdrawn
C01-1960 Hatfield 500 kV 500 931.1 Gas Active
C01-1723 Hatfield 500 kV 500 700 Gas Active
G51_W60 Greene Energy Resource Recovery Project 500 525 Coal Withdrawn
L10 Hatfield 500 kV 500 520 Coal Withdrawn
AA2-173 Hilltop Energy Center Facility 500 515 Gas In Service
AI2-443 North Longview 500 kV 500 295 Hybrid Withdrawn
AH2-279 Whiteley 138 kV 138 150 Battery Withdrawn
AC2-142 Hilltop Energy Center Facility 500 129.7 Gas In Service
AH1-367 Franklin 138 kV 138 54 Hybrid Withdrawn
AH1-367A Iron Javelin Emerald 138 43.2 Solar Withdrawn
AI2-185 Franklin 138 kV 138 41 Hybrid Withdrawn
AF1-297 North Longview 500 kV 500 31.7 Solar Withdrawn
AH2-295 Emerald 25 kV 25 24 Solar Withdrawn
AH1-366 Whitely 138 kV 138 22 Hybrid Withdrawn
AI2-186 Franklin 138 kV 138 20.3 Hybrid Withdrawn
AB1-112 Hilltop Energy Center Facility 500 20 Gas In Service
AB1-171 Franklin Generation Facility 25 20 Gas Withdrawn
AD2-002 Evergreene Energy 25 20 Gas Withdrawn
Y2-088 Bayles-Garards Fort 25kV 25 19.9 Gas Withdrawn
AH1-647 Greensboro 25 kV 25 12.3 Hybrid Withdrawn
AI2-184 Whitely 138 kV 138 8 Hybrid Withdrawn
AH1-373 Buckeye No. 3 - Cowell Junction 25kV 25 7.9 Solar Withdrawn
AH1-370 Mather - Stoney Point Junction 25 kV 25 5.4 Solar Withdrawn
K17 Emerald 6 25kV 25 5 Gas Withdrawn
AB1-164 Whitely - Greene Battery Storage Facility 25 0 Battery Withdrawn
O15 Black Oak - Hatfield Wave Trap n/r 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.