Greene, PA interconnection queue
5 active projects totalling 2,295.8 MW in the PJM queue, plus 24 with terminal status (shown greyed).
5active projects
2,295.8active MW
29total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-070 | Hatfield Ferry, Units 1, 2, and 3 | 500 | 1,590 | Coal | Withdrawn |
| AC2-025 | Hatfield 500kV | 500 | 1,140 | Gas | Withdrawn |
| AC1-097 | Renaissance Energy Center | 500 | 1,040 | Gas | Withdrawn |
| C01-1960 | Hatfield 500 kV | 500 | 931.1 | Gas | Active |
| C01-1723 | Hatfield 500 kV | 500 | 700 | Gas | Active |
| G51_W60 | Greene Energy Resource Recovery Project | 500 | 525 | Coal | Withdrawn |
| L10 | Hatfield 500 kV | 500 | 520 | Coal | Withdrawn |
| AA2-173 | Hilltop Energy Center Facility | 500 | 515 | Gas | In Service |
| AI2-443 | North Longview 500 kV | 500 | 295 | Hybrid | Withdrawn |
| AH2-279 | Whiteley 138 kV | 138 | 150 | Battery | Withdrawn |
| AC2-142 | Hilltop Energy Center Facility | 500 | 129.7 | Gas | In Service |
| AH1-367 | Franklin 138 kV | 138 | 54 | Hybrid | Withdrawn |
| AH1-367A | Iron Javelin Emerald | 138 | 43.2 | Solar | Withdrawn |
| AI2-185 | Franklin 138 kV | 138 | 41 | Hybrid | Withdrawn |
| AF1-297 | North Longview 500 kV | 500 | 31.7 | Solar | Withdrawn |
| AH2-295 | Emerald 25 kV | 25 | 24 | Solar | Withdrawn |
| AH1-366 | Whitely 138 kV | 138 | 22 | Hybrid | Withdrawn |
| AI2-186 | Franklin 138 kV | 138 | 20.3 | Hybrid | Withdrawn |
| AB1-112 | Hilltop Energy Center Facility | 500 | 20 | Gas | In Service |
| AB1-171 | Franklin Generation Facility | 25 | 20 | Gas | Withdrawn |
| AD2-002 | Evergreene Energy | 25 | 20 | Gas | Withdrawn |
| Y2-088 | Bayles-Garards Fort 25kV | 25 | 19.9 | Gas | Withdrawn |
| AH1-647 | Greensboro 25 kV | 25 | 12.3 | Hybrid | Withdrawn |
| AI2-184 | Whitely 138 kV | 138 | 8 | Hybrid | Withdrawn |
| AH1-373 | Buckeye No. 3 - Cowell Junction 25kV | 25 | 7.9 | Solar | Withdrawn |
| AH1-370 | Mather - Stoney Point Junction 25 kV | 25 | 5.4 | Solar | Withdrawn |
| K17 | Emerald 6 25kV | 25 | 5 | Gas | Withdrawn |
| AB1-164 | Whitely - Greene Battery Storage Facility | 25 | 0 | Battery | Withdrawn |
| O15 | Black Oak - Hatfield Wave Trap | n/r | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.