Ivor-Oak Ridge substation interconnection queue

1 active project totaling 32.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Ivor-Oak Ridge as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Jun 2022 to Sep 2027 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
32.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC2-079 Windsor PVI 115 32.3 Solar Under Construction Sep 2027
AF2-402 Ivor-Oak Ridge 115 kV 115 6.3 Solar Withdrawn Jun 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Isle of Wight County, VA

All 25 PJM queue filings in Isle of Wight County, VA.

Other PJM queue substations in Southampton County, VA

All 31 PJM queue filings in Southampton County, VA.