Crosswicks 230 kV
PJM queue ID C01-1190
Crosswicks 230 kV (C01-1190) is listed in the PJM interconnection queue as a 158 MW battery project in Burlington County, NJ. The filing names Crosswicks as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 30, 2031.
| Queue ID | C01-1190 |
|---|---|
| Project name | Crosswicks 230 kV |
| Status (as published) | Active |
| Substation | Crosswicks |
| Point of interconnection | Crosswicks 230 kV |
| County | Burlington |
| State | NJ |
| Voltage | 230 kV |
| Capacity | 158 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2031-04-30 |
| Source dataset | cycle |
Same substation and county
Crosswicks substation: 3 requests in the PJM queue, 2 active totaling 161 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| W1-121 | Property #6 | 3 | Solar | In Service |
| W3-130 | Mansfield Solar | 3.2 | Solar | Withdrawn |
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Scarlet Oak Energy Center, LLC |
|---|---|
| Transmission owner | PSEG |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 158.0 |
| MW capacity | 158.0 |
| MFO | 158.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/29/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.