Property #6

PJM queue ID W1-121

Property #6 (W1-121) is listed in the PJM interconnection queue as a 3 MW solar project in Mercer County, NJ. The filing names Crosswicks as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 1, 2012.

Queue IDW1-121
Project nameProperty #6
Status (as published)In Service
SubstationCrosswicks
Point of interconnectionCrosswicks 13kV
CountyMercer
StateNJ
Voltage13 kV
Capacity3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2012-01-01
Source datasetserial

Same substation and county

Crosswicks substation: 3 requests in the PJM queue, 2 active totaling 161 MW.

Queue IDProjectMWResourceStatus
C01-1190Crosswicks 230 kV158BatteryActive
W3-130Mansfield Solar3.2SolarWithdrawn

Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8
MW capacity3.04
MFO8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.