Property #6
PJM queue ID W1-121
Property #6 (W1-121) is listed in the PJM interconnection queue as a 3 MW solar project in Mercer County, NJ. The filing names Crosswicks as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 1, 2012.
| Queue ID | W1-121 |
|---|---|
| Project name | Property #6 |
| Status (as published) | In Service |
| Substation | Crosswicks |
| Point of interconnection | Crosswicks 13kV |
| County | Mercer |
| State | NJ |
| Voltage | 13 kV |
| Capacity | 3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2012-01-01 |
| Source dataset | serial |
Same substation and county
Crosswicks substation: 3 requests in the PJM queue, 2 active totaling 161 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1190 | Crosswicks 230 kV | 158 | Battery | Active |
| W3-130 | Mansfield Solar | 3.2 | Solar | Withdrawn |
Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 8 |
| MW capacity | 3.04 |
| MFO | 8 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.