Named in 1 PJM planning document for 1 project, on November 3, 2026.

Newdescribed as
PJM system-widezone
500/230kVkV as printed
1mentions

Described as new. The quoted wording calls this substation new. “Build a new 500/230kV substation called Thornburg” — source, page 14

Generation interconnection requests filed in Caroline, VA: PJM queue, 14 active of 62. Same county, not the same substation.

Location

38.1302, -77.4646 · Caroline County, VA · view on a map

Point published by the utility. The utility publishes this point, on a project map or in a filing. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Printed by the sponsor: Dominion's GeoVoice project portal for North Anna-Bristers (WSP-built) defines substations_proposed = [{ name: "Thornburg Substation", lat: 38.130156, lng: -77.464564 }] in its map script. The same portal loads dist/kml/proposed-footprint-boundary.kml (toggled by toggleThornburgSubstation), a 'Proposed Footprint' polygon spanning roughly 38.1278-38.1321 N, -77.4618 to -77.4678 W (Shape_STAr 1,342,491 sq ft, about 30.8 acres), which contains the marker. This is a web-map marker plus a footprint polygon, not a surveyed point in a filing.

Note: No location conflict found. Name changed: Fall 2025 materials (Kraken Loop fact sheet, letter, overview map) say 'proposed Kraken Substation in Caroline County'; Spring 2026 materials say 'proposed Thornburg Substation in Caroline County'. The two overview maps put the station at the same place (NE end of Segment 2). Valley Link's page calls it 'Dominion Energy's Thornburg Substation' but also says it is 'part of Valley Link Transmission Company LLC'; ownership split is not stated. Same station as tracker entry dom/thornburg.

County: the Census county at this point.

Sources: North Anna to Bristers (Dominion project page) (undated page; current 2026) · GeoVoice portal map script (dominion/northannatobristers; old path dominion/KrakenLoop 301-redirects here) (undated; live 2026-10-25) · Proposed footprint boundary KML (Thornburg) (undated) · Project Overview Map, North Anna - Bristers 500 kV and 230 kV (Spring 2026) (Spring 2026), p. 1 · Project Overview, Kraken Loop 500 kV (Fall 2025) (Fall 2025), p. 1 · Virtual community meeting transcript, North Anna to Bristers (2026-05-07), p. 2 · North Anna to Bristers fact sheet (April 2026), p. 1 · Thornburg Substation (Valley Link Transmission) (undated (c)2025). Researched by Substation Scout; checked November 21, 2026.

Same name on other Substation Scout pages

Other sources that print a substation named “Thornburg”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

Part of a named transmission project: Valley Link ($5,115M (2026 dollars)).

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Valley Link Transmission Project Schedule & Cost Estimate Update
b4000.2
Not printed $5,115M 5/31/2031 Not printed 2026-11-03
TEAC

Other substations in this project

“Valley Link Transmission Project Schedule & Cost Estimate Update” also names 12 other substations, with what the most recent document says about each.

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$2,995M → $5,115M 2026-11-03 2026-11-03

Every mention

DateDocumentProjectWhat the document says about it
2026-11-03 TEAC
Item 09 - Reliability Analysis Update p. 14
Valley Link Transmission Project Schedule & Cost Estimate Update “Build a new 500/230kV substation called Thornburg”
500/230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first