Thornburg
Named in 1 PJM planning document for 1 project, on November 3, 2026.
Described as new. The quoted wording calls this substation new. “Build a new 500/230kV substation called Thornburg” — source, page 14
Generation interconnection requests filed in Caroline, VA: PJM queue, 14 active of 62. Same county, not the same substation.
Location
38.1302, -77.4646 · Caroline County, VA · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Printed by the sponsor: Dominion's GeoVoice project portal for North Anna-Bristers (WSP-built) defines substations_proposed = [{ name: "Thornburg Substation", lat: 38.130156, lng: -77.464564 }] in its map script. The same portal loads dist/kml/proposed-footprint-boundary.kml (toggled by toggleThornburgSubstation), a 'Proposed Footprint' polygon spanning roughly 38.1278-38.1321 N, -77.4618 to -77.4678 W (Shape_STAr 1,342,491 sq ft, about 30.8 acres), which contains the marker. This is a web-map marker plus a footprint polygon, not a surveyed point in a filing.
Note: No location conflict found. Name changed: Fall 2025 materials (Kraken Loop fact sheet, letter, overview map) say 'proposed Kraken Substation in Caroline County'; Spring 2026 materials say 'proposed Thornburg Substation in Caroline County'. The two overview maps put the station at the same place (NE end of Segment 2). Valley Link's page calls it 'Dominion Energy's Thornburg Substation' but also says it is 'part of Valley Link Transmission Company LLC'; ownership split is not stated. Same station as tracker entry dom/thornburg.
County: the Census county at this point.
Sources: North Anna to Bristers (Dominion project page) (undated page; current 2026) · GeoVoice portal map script (dominion/northannatobristers; old path dominion/KrakenLoop 301-redirects here) (undated; live 2026-10-25) · Proposed footprint boundary KML (Thornburg) (undated) · Project Overview Map, North Anna - Bristers 500 kV and 230 kV (Spring 2026) (Spring 2026), p. 1 · Project Overview, Kraken Loop 500 kV (Fall 2025) (Fall 2025), p. 1 · Virtual community meeting transcript, North Anna to Bristers (2026-05-07), p. 2 · North Anna to Bristers fact sheet (April 2026), p. 1 · Thornburg Substation (Valley Link Transmission) (undated (c)2025). Researched by Substation Scout; checked November 21, 2026.
Same name on other Substation Scout pages
Other sources that print a substation named “Thornburg”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Thornburg: Expansion Tracker, PJM planning: DOM state not printed
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
Part of a named transmission project: Valley Link ($5,115M (2026 dollars)).
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Valley Link Transmission Project Schedule & Cost Estimate Update b4000.2 |
Not printed | $5,115M | 5/31/2031 | Not printed | 2026-11-03 TEAC |
Other substations in this project
“Valley Link Transmission Project Schedule & Cost Estimate Update” also names 12 other substations, with what the most recent document says about each.
- Amos PJM system-wide Work described at it
- Aspen PJM system-wide Work described at it — “Doubs-Aspen 500 kV line” (p. 14)
- Doubs PJM system-wide Work described at it — “Loop in the Doubs-Goose Creek 500 kV line” (p. 14)
- Goose Creek PJM system-wide Work described at it — “Loop in the Doubs-Goose Creek 500 kV line” (p. 14)
- Joshua Falls PJM system-wide Work described at it
- Morrisville PJM system-wide Work described at it — “Cut in 500kV line Spotsylvania – Morrisville into Yeat” (p. 14)
- North Anna PJM system-wide Work described at it — “line from North Anna to Thornburg” (p. 14)
- Rocky Point PJM system-wide New — “Construct a new substation called Rocky Point” (p. 14)
- Spotsylvania PJM system-wide Work described at it — “Cut in 500kV line Spotsylvania – Morrisville into Yeat” (p. 14)
- Welton Spring PJM system-wide New — “Construct a new 765 kV switchyard (Welton Spring)” (p. 14)
- Woodside PJM system-wide Work described at it — “Woodside-Goose Creek 500 kV line” (p. 14)
- Yeat PJM system-wide New — “Build a new 765/500KV substation called Yeat” (p. 14)
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate prior value printed on the same page |
$2,995M → $5,115M | 2026-11-03 | 2026-11-03 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-11-03 | TEAC Item 09 - Reliability Analysis Update p. 14 |
Valley Link Transmission Project Schedule & Cost Estimate Update | “Build a new 500/230kV substation called Thornburg” 500/230kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.