0 active projects
totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
AG2-497
Tangy 138 kV
138
50
Battery
Withdrawn
AG2-235
Lincoln-Berrywood 69 kV
69
30.7
Solar
Withdrawn
Y1-063
Trenton 34.5kV
34.5
0
Battery
Deactivated
Y1-064
Berkshire 3.4kV
34.5
0
Battery
Withdrawn
Y3-097
Trent (Jug St.) 34.5kV
34.5
0
Battery
Deactivated
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.