Elmont substation interconnection queue
1 active project totalling 53.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
53.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-323 | Elmont 230 kV | 230 | 100 | Battery | Withdrawn |
| AC1-191 | Springfield Solar | 115 | 53.4 | Solar | Engineering and Procurement |
| AI2-010 | Elmont 34.5 kV | 34.5 | 20 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.