Substation Scout

Elmont substation interconnection queue

1 active project totalling 53.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
53.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-323 Elmont 230 kV 230 100 Battery Withdrawn
AC1-191 Springfield Solar 115 53.4 Solar Engineering and Procurement
AI2-010 Elmont 34.5 kV 34.5 20 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.