Lumberton SP

PJM queue ID V4-005

Lumberton SP (V4-005) is listed in the PJM interconnection queue as a 1.1 MW solar project in Burlington County, NJ. The filing names Southampton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 10, 2011.

Queue IDV4-005
Project nameLumberton SP
Status (as published)In Service
SubstationSouthampton
Point of interconnectionSouthampton 13.8kV
CountyBurlington
StateNJ
Voltage13.8 kV
Capacity1.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2011-11-10
Source datasetserial

Same substation and county

Southampton substation: 7 requests in the PJM queue, 2 active totaling 81.1 MW.

Queue IDProjectMWResourceStatus
C01-2140Southampton 115 kV80BatteryActive
W3-0301626 Route 701.9SolarWithdrawn
AE2-076Southampton 13.2 kV0.8SolarWithdrawn
W1-102Southampton 13kV0.7SolarWithdrawn
W2-058Southampton 13kV0.4SolarWithdrawn
AE2-085Southampton 13.2 kV0HybridWithdrawn

Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy2.9
MW capacity1.1
MFO2.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.